Home>New>10 tons fast loading chain boiler for beverage

10 tons fast loading chain boiler for beverage

If you are interested in our products, Please get in contact with us .

E-mail: zhulin@zozen.com Chat Line Send Inquiry

Fast-loading chain grate boiler is designed by our company according to the needs of the vast number of consumers and the advantages of similar products. It has the advantages of fast installation, time-saving and material-saving, compact structure, small floor area, high reliability, high thermal efficiency and strong overload capacity. It is the best design product of similar products in China.

The arch design of chain grate boiler adopts the latest scientific research achievement of "Xi'an Jiaotong University National Science and Technology Progress Second Prize". It has a low and long back arch, the exit section is anti-inclined, the front arch inclination angle of 45 degrees and the back arch echo, forming an inverted "a" flame, and is conducive to the combustion of inferior coal, all kinds of coal and biomass are adapted. Quick-loading chain furnace by pulling the risers on both sides headers to the furnace, and then lead into the lower side of the drum and cover the bottom of the drum with insulation material to form the top heating surface. The new furnace structure successfully solves the problem that the bottom of the drum is directly radiated by high temperature flame and avoids the defect of "bulging".

10 tons fast loading chain boiler for beverage

Our company designed push-pull type gate ash cleaning device, the gate using heat-resistant cast iron finishing sealing structure, thereby effectively preventing secondary combustion deformation and air leakage. It can greatly reduce the loss of energy consumption, save costs, but also played a very good environmental protection effect.

A number of Henan Beverage and Food Factory on the new fast-loading chain boilers, of which Henan White Elephant Food Factory is the use of 10 tons of fast-loading biomass chain boilers. The main chain of fast assembling chain boiler is vertical arrangement of single pot. A single return thread cigarette tube is arranged in the drum. Light pipe water wall is installed on both sides of the furnace. Some risers are drawn to the furnace to form the top of the furnace. The bottom of the drum is hung with firebricks, and it does not accept the radiation of high temperature flame. There are two symmetrical flue pipes under both sides of the drum. In addition, the water wall curved pipe is assembled exclusively at 750 mm from the central line of the drum to completely solve the problem of tearing weld caused by the heat rise and cold shrinkage of the drum and header.

This series of production processes not only pursue excellence, at the same time each component is subject to strict quality control. We all know that once the boiler's internal treatment is not in place, the service life of the boiler will be affected. This is not the most serious problem, because some boilers are working under medium pressure, sub-high pressure conditions, if there is a bit of imprecise quality problems, will cause great accidents. The precise quality control of each process is also the responsibility of the manufacturer, but also the inspection of conscience, so the white elephant manufacturer of 10 tons of biomass fast-loading chain boiler approval is beyond doubt.

Get Latest Price

We guarantee that your information will not be divulged to third parties and reply to you within 24 hours.

If you need the latest price list, please leave us a message here, thank you! We guarantee that your information will not be divulged to third parties and reply to you within 24 hours.

  • Product Name(*)
  • Your Name
  • Your Email(*)
  • Your Tel
  • Requirements( as specific as possible*)

Hot Products